Connection Fees
(One):
- Connection directly to existing water line within Randolph Township or presently operated and maintained by the Township, connection to water lines constructed by the Township or its predecessors as a capital project or otherwise, constructed by any other governmental or public agency, or constructed by a developer as an on-site, on-tract, off-site or off-tract improvement in conjunction with the development of a subdivision or site plan.
- Each apartment unit, condominium unit, seasonal occupancy unit, townhouse unit or single family dwelling already in existence or to be newly constructed and not presently connected to the water system shall pay a connection fee as follows:
- Single-family dwelling, apartment unit, condominium unit, seasonal occupancy unit, cooperative apartment unit, townhouse unit, or any other multiple dwelling unit, per unit constructed by developer in conjunction with a subdivision or site plan where the developer is installing the water line at its cost.
- $1,600
- Single-family dwelling, apartment unit, condominium unit, seasonal occupancy unit, cooperative apartment unit, townhouse unit, or any other multiple dwelling unit, per unit not constructed by developer in conjunction with a subdivision or site plan where the property owner is installing the water line at its cost
- $2,000
- Single-family dwelling, apartment unit, condominium unit, seasonal occupancy unit, cooperative apartment unit, townhouse unit, or any other multiple dwelling unit, per unit constructed by developer in conjunction with a subdivision or site plan where the developer is installing the water line at its cost.
- Commercial and industrial connections (including condominium offices and cooperative offices): The connection fee shall be computed for each connection based on the charge for a single family dwelling multiplied by the equivalent number of single family units contributing the same flow rate to the system in accordance with the following standards:
- The design flow rate for one single-family dwelling is 300 gallons per day.
- The design flow rate for various types of establishments, as set forth in the applicable regulations of the New Jersey Department of Environmental Protection ("NJDEP") as amended, currently cited in NJ.A.C. 7:14A-23.3 shall be used to determine the equivalency factor for the type of establishment listed therein.
- In any case where the design flow cannot be reasonably established, using NJ.A.C. 7:14A-23.3 as a guide, the township shall determine the design flow by such means as are, in its opinion, fair and equitable. The minimum connection fee shall be equivalent to that of one single family dwelling as set forth above.
- Schools, municipal facilities, churches and charitable institutions
- Same as commercial and industrial connections
- Motels, hotels, nursing homes, lodging homes (and other types of similar lodging)
- Same as commercial and industrial except that only one connection shall be required
- Property owners or their successors previously assessed by Randolph Township for installation of water mains in front of their properties shall receive a single credit of $550 toward connection fees. The remainder of the connection fees shall be paid to the township.
- The cost of making any connection, including labor, material and inspection fees shall be the expense of the owner.
- Each apartment unit, condominium unit, seasonal occupancy unit, townhouse unit or single family dwelling already in existence or to be newly constructed and not presently connected to the water system shall pay a connection fee as follows:
Other Fees
(Two):
Topics | Fees |
---|---|
Water stub/curb box | $1,650 |
Construction water (new homes only) | $80 |
¾" wet tap | $225 |
1" wet tap | $300 |
¼" wet tap | $375 |
1 ½" wet tap | $450 |
1 ¾" wet tap | $525 |
2" wet tap | $600 |
¾" water meter | $225 |
1" water meter | $375 |
1 ½" water meter | $750 |
2" water meter | $950 |
Meter Interface Unit (MUI) | $160 |
Fire connection/sprinkler system inside | $0.30/square foot or $3,000 (max.) |
Pool filling/hydrant use up to 20,000 gallons | $400 |
Over 20,000 gallons per thousand | $6 |
Hydrant meter fee for construction | $400 |
Hydrant meter refundable deposit | $800 |
Installations
(Three):
All meter installations not installed by the Township shall be inspected by the Township prior to use.
Miscellaneous
(Four):
- Please note: The curb box is to be maintained by the property owner and be accessible at all times. Repairs of curb box by the township - Actual cost (labor and materials) plus 15%.
- In the event any developer or contractor shall be using Township water for construction in any other zone in connection with commercial, business, industrial, multi-family or any other use, said fee shall be determined by the township at the time of application for a permit to construct.
- A fee of $1,500 shall be paid to the township by any person or corporation for utilizing an unmetered fire hydrant for any unauthorized use including, but not limited to, the filling of an above ground or in ground swimming pool.
- Repair of a frozen meter or meters damaged by user's negligence: Actual cost (labor and materials) plus 15%.