Construction Permits

Overview

The Randolph Township Office of Construction Codes is responsible for issuing all construction permits in accordance with the New Jersey Uniform Construction Code. The process of obtaining permits, approvals, and variances can involve several different departments and may seem overwhelming at first glance. We've attempted to simplify our explanation by providing you with answers to frequently asked questions located at the bottom of this page.

If you have any questions, we suggest you call our office during the planning stages. We may be reached at 973-989-7070.

Permit Application Forms

For your convenience in submitting permit application(s), we have made the most commonly requested forms available here for download. For a complete list, visit the Department of Community Affairs website. These fillable forms may be filled out on your computer, saved to your hard drive, and/or printed out.

  • UCC-F170 Construction Permit (PDF)
    This form needs to be submitted with each permit application. It should describe the type of work you are planning to do, provide the work site and contractor information, and the estimated cost of work.
  • UCC-F100 Construction Permit Application (PDF)
    This application form needs to accompany the subcode technical sections. Please be sure the certification in lieu of oath is signed.
  • UCC-F110 Building Subcode Technical Section (PDF)
    This form is to be used for decks, pools, sheds over 200 square feet, commercial work, and other interior and exterior construction projects. When in doubt, please call for clarification.
  • UCC-F120 Electrical Subcode Technical Section (PDF)
    This form should be used for all electrical work related to a project. A licensed electrician must sign and seal the application unless the work is being completed by the homeowners in an owner-occupied single-family dwelling.
  • UCC-F130 Plumbing Subcode Technical Section (PDF)
    This form should be used for all plumbing work related to a project. A licensed plumber must sign and seal the application unless the work is being completed by the homeowners in an owner-occupied single-family dwelling.
  • UCC-F140 Fire Protection Subcode Technical Section (PDF)
    This form is required for any fire protection work being performed. Please be sure the certification in lieu of oath (Section C) is signed.
  • UCC-F370 Chimney Verification for Replacement of Fuel-Fired Equipment (PDF)
    This form needs to be completed for any replacement or newly installed furnaces, boilers, fireplaces or chimney liners. If a new chimney liner is being installed, please provide the specifications on the liner along with the chimney verification form signed by a certified professional.
  • UCC-F390 Framing Checklist (PDF)
    This form is required for any new construction. Builder checks boxes marked "B" and the responsible person in charge of work signs and dates. This form is to be presented to the building inspector when the framing inspection is scheduled.

Zoning & Permit Requirements

Not sure what permits and approvals will be required for your particular project? We have put together a chart that indicates zoning and permit requirements for many of the activities a homeowner may contemplate undertaking on his/her residence. View our zoning and permit requirements table.

ActivityZoning Approval?Construction Permit?
AdditionsYesYes
Air conditioner (central): install or replaceYesYes
Asbestos abatementNoYes
Basement: refinishing/remodelingYesYes
Bathroom fixtures: direct replacement and/or piping changesYesYes
Boiler: replaceNoYes
Burglar alarm: installNoYes
CarpetingNoNo
Chimney: repairsNoYes
Commercial signs (exterior)YesYes
Deck: add or replaceYesYes
DemolitionYesYes
Dishwasher: installYesYes
Door (exterior): replace existing with same size and typeNoNo
Door (exterior): adding, enlarging or eliminatingYesYes
Driveway: repair or repaveYesNo
Duct work: install newNoYes
Duct work: repair or replaceNoNo
Electrical: any modifications or improvementsNoYes
Fence (around a pool or over 6'): add or replaceYesYes
Fence: repairYesNo
Fireplace: addYesYes
Furnace: replaceYesYes
Generator (stand-alone)YesYes
Gutters: replace or repairNoNo
Landscaping workNoNo
Lawn sprinkerNoYes
Lead paint abatementNoYes
Ordinary repairsNoNo
Outdoor kitchenYesYes
Painting (exterior or interior)NoNo
PatioYesYes
Plumbing: any modifications or improvementsYesYes
Remodeling or alterations (interior)YesYes
Retaining wallsYesYes
Roof: repairs involving less than 25% of existing roofNoNo
Roof: replaceNoYes
Roof top unitYesYes
Satellite dishYesYes
Septic system: construct or abandonNoYes
Sewer system: connect to the public systemNoYes
Shed or other utility building: constructYesYes
Siding: add or replaceNoYes
Smoke detectors: addNoYes
Solar panelsYesYes
Spa/hot tubYesYes
Storm windows/doorsNoNo
Stove: replace electric with gasNoYes
Swimming pool: add or replaceYesYes
Tennis court: installationYesYes
Underground fuel or septic tank: removeNoYes
Water heater: replaceNoYes
Wall repairs: sheet rock or plaster onlyNoNo
Windows: replace existing with same size and typeNoNo
Windows: adding, enlarging, or eliminatingNoYes

Consequences Of Working Without A Required Permit

  • You may subject yourself to penalties and/or fines of up to $2,000 a day until permits are issued.
  • If you proceed with your construction project without having a required permit and you get "caught," before a permit can be issued you will need zoning approval and you may need a variance or planning board approval. If these approvals/variances are denied, you may be required to remove the constructed improvement.
  • You might unknowingly receive substandard materials and/or workmanship from a contractor.
  • If you have an insurance claim related to any work done without permits, your carrier may not pay the claim. They often check with the township for permits and the required inspections.